It was a cloudy morning, cool and misty. I cleaned up the greenhouse, washing away the remains of honey and wax from straining the hive; swept the floor; consolidated bags of potting soil. Once the space was clear, I moved the spring crops in-- they have spent the last three weeks in my classroom, growing under lights. I planted some kale, lettuce, argula, and mustard starts in the ground and watered them in. They look a little beat, but will recover. Once everything old was in order, I brought out the tomato and pepper seeds and planted them, two by two, in the deep six-packs. They will go to school on Monday morning to bask in light and warmth until Spring Break. The planting season has begun.
Showing posts with label greenhouse. Show all posts
Showing posts with label greenhouse. Show all posts
Sunday, March 4, 2018
Sunday, April 2, 2017
Greenhouses in March
The
best thing about the greenhouse in March—work goes on even when it rains. For
years, I had to either wait for a dry day (yeah, right) or spread dirt all
through the house to transplant the tomatoes and cold weather crops in late
March. For the last two years, I have
been able to look at the plants, decide it was time, and go to work. On
Thursday, I spent several hours in the greenhouse, bumping up plants, painting
signs, and generally cleaning up. Lucy watched from her high perch.
Periodically, the rain poured down, pounding on the roof and filling the
buckets outside. Inside, we were warm and dry, scooping earth into four inch
pots, and settling the summer crops.
When I was done, the planting shelf was full of tiny tomatoes, buried up
to their noses, and ready to grow. And toady, the space is warm and lush,
perfect for reading and growing.
Monday, September 21, 2015
Planning for Solar Panels, part three
The planning and execution of our
greenhouse/solar panel structure has been complex. We needed to shift
installation companies, apply for retro-active permits, and build the
structures during the hottest summers on record. It was a whole summer project,
which has just wrapped up last week.
Because of rebates, a real concern about climate change,
striving for the Georgetown Energy prize, and peer pressure, solar panel
installation is way up in Corvallis this year. In March, solar companies were
seeing a ten fold increase in the number of people interested in installation
and that continued throughout the summer. All of the companies in town were
booked out early. We worked with Benton Electric, who was able to reach further
afield for teams, but the press of business made communication difficult, which
had long term impacts on the permitting process.
In late June, we worked with
Benton Electric to begin the process. They calculated that eight panels,
creating a 2.2 kw system, should cover our use for the year, if we were
conservative. Nine would be better, but they would block considerable light
into the greenhouse, and we decided against the extra panel. Once we had the
dimensions for the layout of the panels, our builder went to work constructing
the greenhouse and panel rack. It is an uneven hexagon, a bay with windows of
three different sizes projecting into the yard, with a long annex that reaches
all along the neighbor’s garage. Because of the design, it does not dominate
the view of the gardens, but blends in, even without mature plantings. For
days, he dug deep post holes and planted the treated beams that would hold the
structure upright. Once they were all planted, he needed to cut the roof
angles, all different because of the shape. When the angles were cut, he had
down the roof and framed in the windows, then hung them, and framed them in
with cedar. Once the greenhouse was finished, we painted the clawfoot tub and
moved it in, setting up the shower.
When the greenhouse was complete,
Mark, our builder, moved onto the rack for the panels, which is also a funky
structure of angles and braces, raising the panels thirteen feet above the
ground for maximum light and minimal visual intrusion. He finished the evening
before the panels were to be installed. The next day, in early August, the
installers arrived. “That’s interesting,” the head installer commented, “but I
can work with it.” In four hours, they had installed the panels, wired the
system in, and added an outlet in the greenhouse. We were on track for completion, just waiting on the electric
installation….
And then things came to halt. The
electrical inspector, seeing the structure and thinking “that’s weird” referred
us for a building permit before the electric could be inspected. “But we don’t need a permit,” I argued, “the
structure is too small.” “Code says that you do,” the city returned. What code?
We don’t know. What did we do wrong? We don’t know. One person talked about
earthquakes, another about hurricane force winds. Maybe we should cement the
posts in, even though that rots them faster….it was never really clear. Don’t
ask, was the general message. Hire a structural engineer to write a letter
saying that the whole plan is ok. It will be easier than bringing it up to
building code. So we did. “Humrph,” he said. “That’s interesting. Lets put a little brace in here and call it
good.” “A trellis? I can live with a trellis.” Several weeks later, we received
the retroactive permit and passed the electric inspection. But the panels were
still not on.
Pacific Power needed to replace
our meter—and Benton Electric needed to repair a fuse so that the system
worked. That added another week to the whole process….finally, I came home to a
new meter. Two days later, to a functional system. The meter was spinning
backwards! For the first week, we produced four to five kwh per day; when the clouds went away,
production went up to six, then seven, and today, eight. We are at the equinox,
with the sun sliding down in the sky further every day, so production will
slowly drop off for winter.
So, what did we learn from the
process? Perhaps to ask very specific questions before building—despite talking
with three city departments, we did not know that we needed permits for the
structure that attaches the panels to the greenhouse. Now that we are done, we
are working to live within our means, to not use any more electricity that we
will produce, even if we are not always using fresh electrons.
Fish Pie
This is a layered dish.
Layer one: finely diced carrots
and celery to cover the bottom of the dish, followed by .25 pounds of various
fish—shrimp or scallops, salmon, and white fish. Scraps are good.
Layer two: 1.5 cups of white
sauce, with leeks, salt and pepper.
Layer three: mashed potatoes for
a crust.
Bake until bubbly in a 350 degree
oven.
Tuesday, July 14, 2015
Planning forSolar Panels/greenhouse, Part Two
| The garden bed before construction |
The greenhouse/solar panels project is progressing. We
have determined that we will need eight solar panels to cover our energy use
for the year, and they will be laid, in two rows, landscape, over the
greenhouse, about twelve feet in the air. This will minimize the visual impact
and raise them well above any local shrubs and foliage, thus increasing efficiency.
The greenhouse itself will tuck
underneath, with an asymmetrical bay window in the front, projecting a little beyond
the edge of the old flower bed and the raised beds of the vegetable garden. It is already creating more of a room around
the dining table, which is tucked into the ell of the house and ties in nicely
to the flourishing gardens in the back. There’s been considerable geometry used
in the back yard this week.
Once the frames are all
constructed, the green house will have a clear plastic roof and walls made from
old double paned windows from a farm shop, then framed simply in fir. There will be a narrow
green metal band around the bottom to mimic the garden shed, and a red wooden
door on one end. Inside, we’ll set a claw foot tube, Mark’s tea plant, and all
of the starts for next year (along with a folding chair and probably a high up
cat perch). Although the solar panels will have a much greater impact on our
energy use, we are far more excited about the greenhouse!
| C |
| Cleared ground |
| Two days in |
| four days in |
Sunday, May 10, 2015
Planning for Solar Panels, part one
Planning for the
solar panels/greenhouse has begun….I came home last week to find two men
sitting in my back yard, contemplating the blue wall. One had a notebook, the
other a tape measure. They were discussing building code.
We began thinking about solar panels last winter,
when we went to a presentation, not because we were interested, but because we
wanted to think about something positive in town for a change. But, after
hearing about the rebates, and looking at our electric bill, I was intrigued. We
would not need a huge array to produce all of the electricity we use over the
course of a year, especially if I took down a string or two of Christmas
lights. We average 8 KWH per day. I called Abundant Solar, Kirk came out with
his solar gain measuring tool from the 1970s, and he studied the west facing
roof of the house. Not great…then he wandered into the back yard and eyed the
blue painted wall of our neighbor’s garage. “Are you thinking,” he mused, “of
adding any more buildings back here?” Why yes, we were. I had plans for a green
house in that space. He nodded, climbed on ladders, examined tree shadows,
glared at the huge yellow plum in the middle of the yard, and began to plan.
A few weeks
later, we had generated a list. The structure should:
·
Generate all of our electricity over the course of the
year.
·
Provide a warm place to start all of our seeds, raise
chicks in the awkward stage (too big for house, too small for coop), and
shelter the beehive in cold winters.
·
Extend the growing season—eggplants and hot peppers?
Salad greens in winter? A citrus tree? A tea plant or two?
·
Hold the soaking tub and provide a nicer place to
bathe.
·
Allow Mark to read outside and stay warm in the winter.
·
Not mess up the already existing eating area in the
nook of the house and garage.
·
Look nice. I’d like the roofline to echo the shed’s
interesting overhang, which Mark built.
Once we had the
list and had paced around the backyard for a few hours, we called Mark Meyer,
our builder, who is a genius at taking my vague ideas and turning them into
beautiful structures. He was one of the men sitting in my backyard,
contemplating the wall a few days later.
He had a sketch of a bayfront greenhouse that would sit under the
panels, shifted to one side of the wall, before he went home to investigate building
code. Just how close could we come to that garage? We should know on Tuesday.
Meanwhile, we
have begun to assemble various parts. Mark found a pile of double paned windows
in aluminum frames on Craig’s List for one hundred dollars. “It looks like a
good deal,” he told me. When I followed up, the seller had found three more,
and threw them in for the same price. We now had a pile of windows for the
walls.
I then contacted a friend who had mentioned a staff of claw foot tubs—and yes, they have three in the backyard. I am welcome to one, also for one hundred bucks. Planning has begun.
I then contacted a friend who had mentioned a staff of claw foot tubs—and yes, they have three in the backyard. I am welcome to one, also for one hundred bucks. Planning has begun.
Subscribe to:
Posts (Atom)







